141 data centres and proposed sites, each with the facts we could source and a plain list of what we could not.

Most public data on individual data centres is thin. Capacity, power source and efficiency are often missing, and where they exist they are measured in different ways. So each record shows every figure with its metric (IT load, facility load or grid connection), its stage (announced, permitted, under construction, operating) and its source, and we never add them together. A blank means unknown, not zero.

For the largest AI campuses see frontier AI data centres. To see where this data comes from, and which sources we can and cannot reuse, see data sources.

Clear filters

Filters cover these 141 detailed records. Operating does not mean compute is available to buy. Stage dates and checked dates differ; open each record for its evidence and limits. A field-level view is on the coverage page. Epoch frontier sites are listed separately.

Showing 95 of 141 detailed records.

Records by stage

How many of our records sit at each stage. This counts sites, not megawatts.

  1. Announced8
  2. Permitted1
  3. Under construction1
  4. Operating12
  5. Cancelled1
  6. Stage not known72
Show this chart as a table
Records by stage
StageSites
Announced8
Permitted1
Under construction1
Operating12
Cancelled1
Stage not known72

Angola

Angola
SiteOperatorWhereStageRecord
Raxio Angola AO1Raxio GroupOutskirts of LuandaStage not known
Stage date not recorded
Checked 12 November 2026

Australia

Australia
SiteOperatorWhereStageRecord
Gadi (NCI)Not statedNot statedStage not known
Stage date not recorded
Checked 17 October 2026
Pawsey Centre, Kensington, PerthNot statedKensington, PerthStage not known
Stage date not recorded
Checked 14 October 2026

Brazil

Brazil
SiteOperatorWhereStageRecord
LNCC Santos Dumont hosting location, PetrópolisNot statedPetrópolisStage not known
Stage date not recorded
Checked 14 October 2026

Bulgaria

Bulgaria
SiteOperatorWhereStageRecord
Discoverer (Sofia Tech Park)Not statedSofiaStage not known
Stage date not recorded
Checked 17 October 2026

Canada

Canada
SiteOperatorWhereStageRecord
McGill-Calcul Québec data centre, MontréalNot statedMontréal, QuébecStage not known
Stage date not recorded
Checked 14 October 2026

Congo - Kinshasa

Congo - Kinshasa
SiteOperatorWhereStageRecord
Raxio DR Congo DRC1Raxio GroupLimete industriel, KinshasaStage not known
Stage date not recorded
Checked 12 November 2026

Côte d’Ivoire

Côte d’Ivoire
SiteOperatorWhereStageRecord
Raxio Côte d’Ivoire CIV1Raxio GroupGrand Bassam, VITIBStage not known
Stage date not recorded
Checked 12 November 2026

Czechia

Czechia
SiteOperatorWhereStageRecord
Karolina (IT4Innovations, Ostrava)Not statedOstravaStage not known
Stage date not recorded
Checked 17 October 2026

Ethiopia

Ethiopia
SiteOperatorWhereStageRecord
Raxio Ethiopia ET1Raxio GroupICT Park, Addis AbabaStage not known
Stage date not recorded
Checked 12 November 2026

Finland

Finland
SiteOperatorWhereStageRecord
LUMI (CSC, Kajaani)Not statedKajaaniStage not known
Stage date not recorded
Checked 17 October 2026
LUMI-AI AI Factory system, CSC KajaaniCSC (IT Center for Science)KajaaniAnnounced
Recorded date: 31 August 2026
Checked 2 October 2026
Microsoft Kirkkonummi data centre campusMicrosoftKirkkonummiUnder construction
Recorded date: 28 April 2026
Checked 2 October 2026
Nebius Mäntsälä data centreNebiusMäntsäläOperating
Recorded date: 8 October 2024
Checked 2 October 2026

France

France
SiteOperatorWhereStageRecord
Alice Recoque (proposed TGCC location)Not statedBruyères-le-ChâtelStage not known
Stage date not recorded
Checked 17 October 2026
Digital Realty Paris South (Mistral AI cluster)Digital RealtyParis South campusAnnounced
Recorded date: 28 May 2026
Checked 2 October 2026
Eclairion Bruyères-le-ChâtelEclairionBruyères-le-Châtel, EssonneOperating
Stage date not recorded
Checked 6 October 2026

Germany

Germany
SiteOperatorWhereStageRecord
Digital Realty Frankfurt campus (metro cluster)Digital RealtyFrankfurt am MainOperating
Recorded date: 2 October 2026
Checked 2 October 2026
Google Dietzenbach data centreGoogleDietzenbach, Offenbach district, HesseAnnounced
Recorded date: 11 November 2025
Checked 2 October 2026
Google Hanau data centreGoogleHanau, HesseOperating
Recorded date: 11 November 2025
Checked 2 October 2026
HLRS Stuttgart (Hunter and HammerHAI)High-Performance Computing Center Stuttgart (HLRS)Stuttgart-VaihingenOperating
Recorded date: 16 January 2025
Checked 2 October 2026
JUPITER exascale system, Forschungszentrum JülichForschungszentrum Jülich (Jülich Supercomputing Centre)Jülich, North Rhine-WestphaliaOperating
Recorded date: 5 September 2025
Checked 2 October 2026
Telekom Industrial AI Cloud, Munich (Tucherpark)Deutsche Telekom (T-Systems)Tucherpark, MunichOperating
Recorded date: 4 February 2026
Checked 2 October 2026

Ghana

Ghana
SiteOperatorWhereStageRecord
ACR2 Data CentreNot statedAccraStage not known
Stage date not recorded
Checked 17 October 2026
Onix AccraOnix Data CentresAmrahia-Katamanso, AccraStage not known
Stage date not recorded
Checked 11 November 2026
PAIX Accra (ACC-1)PAIX Data CentresAccraStage not known
Stage date not recorded
Checked 11 November 2026

Greece

Greece
SiteOperatorWhereStageRecord
Daedalus (Lavrio)GRNETLavrioStage not known
Stage date not recorded
Checked 21 October 2026

India

India
SiteOperatorWhereStageRecord
C-DAC Pune National AI Facility (PARAM Siddhi)Not statedPune, MaharashtraStage not known
Stage date not recorded
Checked 14 October 2026
PARAM Ganga (IIT Roorkee)Not statedRoorkeeStage not known
Stage date not recorded
Checked 17 October 2026
PARAM Kamrupa (IIT Guwahati)Not statedGuwahatiStage not known
Stage date not recorded
Checked 17 October 2026
PARAM Shivay (IIT(BHU), Varanasi)Not statedVaranasiStage not known
Stage date not recorded
Checked 17 October 2026

Ireland

Ireland
SiteOperatorWhereStageRecord
Herbata Limited data centre, NaasNot statedHalverstown, Jigginstown and Newhall, Naas, Co. KildareAnnounced
Recorded date: 2 October 2026
Checked 2 October 2026
Orion Business Park data centre, BallycoolinNot statedNorth-West Business Park, Ballycoolin, Dublin 15Stage not known
Recorded date: 9 April 2026
Checked 2 October 2026
Vantage DUB11, Ballybane and Kilbride, ClondalkinVantage Data CentersBallybane and Kilbride, Clondalkin, Dublin 22Stage not known
Recorded date: 4 April 2025
Checked 2 October 2026

Italy

Italy
SiteOperatorWhereStageRecord
Leonardo (CINECA, Bologna)Not statedBolognaStage not known
Stage date not recorded
Checked 17 October 2026

Japan

Japan
SiteOperatorWhereStageRecord
RIKEN Center for Computational Science, Kobe (Fugaku)Not statedKobe, HyogoStage not known
Stage date not recorded
Checked 14 October 2026

Kenya

Kenya
SiteOperatorWhereStageRecord
Africa Data Centres NBO1 NairobiAfrica Data CentresNairobiStage not known
Stage date not recorded
Checked 10 November 2026
Digital Realty (iColo) Mombasa One (MBA1)Digital Realty (formerly iColo)Miritini, MombasaStage not known
Stage date not recorded
Checked 10 November 2026
Digital Realty (iColo) Mombasa Two (MBA2)Digital Realty (formerly iColo)Nyali, MombasaStage not known
Stage date not recorded
Checked 10 November 2026
Digital Realty (iColo) Nairobi One (NBO1)Digital Realty (formerly iColo)Karen, NairobiStage not known
Stage date not recorded
Checked 10 November 2026
iXAfrica NBOX1 Nairobi campusiXAfrica Data CentreCabanas, Mombasa Road, NairobiStage not known
Stage date not recorded
Checked 10 November 2026
PAIX Nairobi (NBO-1)PAIX Data CentresUpper Hill, NairobiStage not known
Stage date not recorded
Checked 10 November 2026
Telkom Kenya Milimani Exchange data centreTelkom KenyaNairobiStage not known
Stage date not recorded
Checked 10 November 2026
Telkom Kenya Mombasa Telephone House data centreTelkom KenyaMombasaStage not known
Stage date not recorded
Checked 10 November 2026

Luxembourg

Luxembourg
SiteOperatorWhereStageRecord
MeluXina (LuxProvide, Bissen)Not statedBissenStage not known
Stage date not recorded
Checked 17 October 2026

Malawi

Malawi
SiteOperatorWhereStageRecord
National Data Centre, LilongweNot statedLilongweStage not known
Stage date not recorded
Checked 17 October 2026

Malaysia

Malaysia
SiteOperatorWhereStageRecord
Bridge Data Centres MY06Bridge Data CentresSedenak Tech Park, JohorStage not known
Stage date not recorded
Checked 17 October 2026

Mozambique

Mozambique
SiteOperatorWhereStageRecord
Raxio Mozambique MZ1Raxio GroupBeluluane Industrial Park, MatolaStage not known
Stage date not recorded
Checked 12 November 2026

Netherlands

Netherlands
SiteOperatorWhereStageRecord
Digital Realty Amsterdam sites (metro cluster)Digital RealtyAmsterdam, Schiphol-Rijk, Hoofddorp and RozenburgOperating
Recorded date: 2 October 2026
Checked 2 October 2026
Equinix Amsterdam IBX sites (metro cluster)EquinixAmsterdamOperating
Recorded date: 2 October 2026
Checked 2 October 2026
Meta Zeewolde data centre (cancelled)MetaZeewolde, FlevolandCancelled
Recorded date: 1 July 2022
Checked 2 October 2026
Microsoft Middenmeer data centreMicrosoftMiddenmeer, Hollands KroonOperating
Recorded date: 23 June 2022
Checked 2 October 2026

Nigeria

Nigeria
SiteOperatorWhereStageRecord
21CTL Ikeja data centre21st Century TechnologiesIkejaStage not known
Stage date not recorded
Checked 12 November 2026
21CTL Ikoyi data centre21st Century TechnologiesIkoyiStage not known
Stage date not recorded
Checked 12 November 2026
Africa Data Centres LOS1 LagosAfrica Data CentresEko Atlantic City, LagosStage not known
Stage date not recorded
Checked 10 November 2026
Digital Realty Lagos LKK2 (Ogbombo)Digital RealtyOgbombo Road, LagosStage not known
Stage date not recorded
Checked 10 November 2026
Digital Realty Lagos LOS1 (Victoria Island)Digital RealtyVictoria Island, LagosStage not known
Stage date not recorded
Checked 10 November 2026
Galaxy Backbone Kano data centreGalaxy Backbone LimitedKanoStage not known
Stage date not recorded
Checked 12 November 2026
Galaxy Backbone NSSC DC1 AbujaGalaxy Backbone LimitedAbujaStage not known
Stage date not recorded
Checked 12 November 2026
Kasi Cloud DNEK CampusKasi CloudEket, Akwa IbomAnnounced
Recorded date: 10 November 2026
Checked 10 November 2026
Kasi Cloud LOS CampusKasi CloudLekki, LagosAnnounced
Recorded date: 10 November 2026
Checked 10 November 2026
Open Access Data Centres Lagos (LOS1)Open Access Data CentresLagos; location conflict recordedStage not known
Stage date not recorded
Checked 10 November 2026
Rack Centre LGS 1 LagosRack CentreOregun, Ikeja, LagosStage not known
Stage date not recorded
Checked 10 November 2026
Rack Centre LGS 2 LagosRack CentreOregun, Ikeja, LagosStage not known
Stage date not recorded
Checked 10 November 2026

Portugal

Portugal
SiteOperatorWhereStageRecord
Deucalion (FCT, Guimarães)Not statedGuimarãesStage not known
Stage date not recorded
Checked 17 October 2026

Singapore

Singapore
SiteOperatorWhereStageRecord
NSCC Fusionopolis (historical ASPIRE 1 host)Not statedFusionopolisStage not known
Stage date not recorded
Checked 14 October 2026

Slovenia

Slovenia
SiteOperatorWhereStageRecord
Vega (IZUM, Maribor)Not statedMariborStage not known
Stage date not recorded
Checked 17 October 2026

South Africa

South Africa
SiteOperatorWhereStageRecord
Africa Data Centres CPT1 Cape TownAfrica Data CentresCape TownStage not known
Stage date not recorded
Checked 10 November 2026
Africa Data Centres JHB1 MidrandAfrica Data CentresMidrand, JohannesburgStage not known
Stage date not recorded
Checked 10 November 2026
Africa Data Centres JHB2 SamrandAfrica Data CentresSamrand, CenturionStage not known
Stage date not recorded
Checked 10 November 2026
ELIDZ data centreNot statedNot statedStage not known
Stage date not recorded
Checked 17 October 2026

Spain

Spain
SiteOperatorWhereStageRecord
MareNostrum 5 (BSC, Barcelona)Not statedBarcelonaStage not known
Stage date not recorded
Checked 17 October 2026

Sweden

Sweden
SiteOperatorWhereStageRecord
Arrhenius (Linköping University campus)Not statedNot statedStage not known
Stage date not recorded
Checked 17 October 2026
EcoDataCenter 1, FalunEcoDataCenterFalunOperating
Recorded date: 16 November 2023
Checked 2 October 2026
EdgeConneX Skellefteå campusEdgeConneXSkellefteåAnnounced
Recorded date: 27 February 2026
Checked 2 October 2026

Uganda

Uganda
SiteOperatorWhereStageRecord
Raxio Uganda UG1Raxio GroupNamanve Industrial ParkStage not known
Stage date not recorded
Checked 12 November 2026

United Arab Emirates

United Arab Emirates
SiteOperatorWhereStageRecord
Moro Hub Green Data Centre (Solar Park)Not statedMohammed bin Rashid Al Maktoum Solar ParkStage not known
Stage date not recorded
Checked 15 October 2026

United Kingdom

United Kingdom
SiteOperatorWhereStageRecord
Ark Cody Park data centre campusArk Data Centres LimitedFarnborough, HampshireStage not known
Stage date not recorded
Checked 10 November 2026
Ark Spring Park data centre campusArk Data Centres LimitedCorsham, WiltshireStage not known
Stage date not recorded
Checked 10 November 2026
Cobalt Park, Wallsend (Stargate UK, North East AI Growth Zone)NscaleWallsend, North TynesideAnnounced
Recorded date: 16 September 2025
Checked 2 October 2026
COLT Hayes data centreColt Data Centre Services UK LimitedHayes, LondonStage not known
Stage date not recorded
Checked 10 November 2026
Colt Powergate data centreColt Data Centre Services UK LimitedNorth Acton, LondonStage not known
Stage date not recorded
Checked 10 November 2026
Didcot North Data Centre CampusAmazon Data Services UK LimitedDidcot, OxfordshireStage not known
Stage date not recorded
Checked 10 November 2026
Global Switch London North (East India Dock House)Global SwitchDocklands, LondonStage not known
Stage date not recorded
Checked 10 November 2026
LON3 Data CentreIron Mountain (UK) Data Centre LimitedSloughStage not known
Stage date not recorded
Checked 10 November 2026
nLighten London Hoddesdon (STN1)nLightenHoddesdon, HertfordshireStage not known
Stage date not recorded
Checked 10 November 2026
North Weald Airfield data centre campusGoogleNorth Weald Bassett, EssexStage not known
Stage date not recorded
Checked 6 October 2026
Romford North Data CentreGreen Mountain DC UK LimitedRomfordStage not known
Stage date not recorded
Checked 10 November 2026
Swindon Data Centre Back-up Generation FacilityAmazon Data Services UK LimitedSwindonStage not known
Stage date not recorded
Checked 10 November 2026
Teesworks data centre siteNot statedRedcar, TeessidePermitted
Recorded date: 11 August 2025
Checked 2 October 2026
Virtus Slough campusVirtus Data CentresSlough, BerkshireOperating
Recorded date: 2 October 2026
Checked 2 October 2026

United States

United States
SiteOperatorWhereStageRecord
Argonne Leadership Computing Facility (ALCF)Not statedArgonne, IllinoisStage not known
Stage date not recorded
Checked 17 October 2026
Google Council Bluffs data centre locationGoogleCouncil Bluffs, IowaStage not known
Stage date not recorded
Checked 14 October 2026
National Energy Research Scientific Computing Center (NERSC)Not statedBerkeley, CaliforniaStage not known
Stage date not recorded
Checked 17 October 2026
Oak Ridge Leadership Computing Facility (OLCF)Not statedOak Ridge, TennesseeStage not known
Stage date not recorded
Checked 17 October 2026

By region

Browse all regions

How we label evidence
  • Official source the body that made the rule or the data says so
  • Two sources agree independent sources match
  • One source, not confirmed a single report or claim
  • Watching a signal, not shown as a fact